The project site: 7600 Better Way, Frisco. Pan and zoom to explore — nearby pins are other tracked filings. Map: © OpenStreetMap contributors.
Baylor Scott & White Health plans a $750K medical building in Frisco
Baylor Scott & White Health is a renovation and alteration project registered with the Texas Department of Licensing and Regulation for 7600 Better Way in Frisco, according to the state's TABS project registry dated October 23, 2026. The project is registered at Baylor Scott & White Health - Frisco Hospital.
Scope of work: The scope of work includes 1,380 sq ft of existing space. Lead shielding is to be added to 3 rooms, which includes their walls, doors and borrowed lites. Power operators with push plates will be added to the doors…. The filing lists an estimated cost of $750,000 and 1,380 square feet of space. The construction window in the filing runs January 4, 2027 to April 5, 2027.
The registered owner is Baylor Scott & White Health. State registration is a planning-stage signal: projects can be revised, delayed, or withdrawn, and a filing does not guarantee the project will be built as described.
County appraisal records add context for the site: the parcel is owned by Baylor Scott & White Health; the existing building dates to 2023; it covers 479,244 square feet; the lot spans 26.8 acres; the parcel last changed hands in 2022.
- Construction project registered with the state (filing TABS2027004310) · October 23, 2026
- Construction window: January 4, 2027 to April 5, 2027 · January 4, 2027
- Completion slated · April 2027, per the state filing
We'll email you when there's news on Baylor Scott & White Health — construction milestones, a completion date, an opening — plus our regular Collin County roundup of what's opening, what's under construction, and what's worth trying.
More openings near this one
About this report: The Collin County Post tracks construction projects registered with the Texas Department of Licensing and Regulation (TABS), the state's registry for architectural projects. Registration is a planning-stage record — it does not guarantee a project will be built as described. Source record: tdlr.texas.gov, project TABS2027004310.
← All Collin County filings · Openings near you · Republish this story free · More Frisco filings